Book a demo
ProductSee it in 5 minutes

Click through five real flows, from enquiry to enrolled. No form.

Take the tour
Guide

Moving to a new student information system: a field guide

How to scope the move, bring your data across, run both systems for a short while and go live in stages. Written for academies, schools, colleges and groups, whatever you run on today.

Changing your student information system is one of the few projects that touches every office at once. Admissions, the registrar, finance, teachers and parents all feel it. Done well, nobody remembers the move by the second term. Done badly, it costs a year of trust. This guide is the order we have seen work.

Know what you are leaving

Most moves start from one of three places. Each breaks in its own way.

  • Spreadsheets and chat groups. The data exists, spread across files that each office keeps its own way. The risk is duplicates: the same family typed three times, with three spellings.
  • A system you built yourselves. Often FileMaker, Access or a custom portal. It fits how you worked when it was built. The risk is that one person knows how it works, and the custom fields mean something only they can explain.
  • Another SIS. The data is cleaner, but it lives in that vendor's codes, grading scales and periods. The risk sits in the mapping, field by field.

Write down which one you are. It decides how long the move takes and where the work is.

Scope day one, not forever

The most common mistake is moving everything at once. Make two lists instead.

  • Day one: what has to work on the first morning. Usually students, families, classes, the register and fees owed.
  • Next term: what can follow. Report cards, next year's admissions, transport, the library.

Ask each office for the three tasks they cannot do without. That list is your scope. Anything nobody names can wait.

For a college or a group, add one more column: who signs off each module. A registrar who owns the data mapping saves weeks of back and forth.

Clean the data before you move it

Messy data moves as easily as clean data, and it is harder to fix afterwards. Before you export:

  • Mark students who left years ago as alumni, or leave them out.
  • Merge duplicate families and check sibling links.
  • Agree one format for names, dates and phone numbers.
  • Decide how much history you need: last year's marks, five years of transcripts, or everything.

Then run a test import and check it with the people who know the records. A registrar spots in ten minutes what an outsider misses in a day.

Run in parallel, briefly

A parallel run means both systems work side by side for a set time. It catches mistakes. It also doubles the typing, so keep it short and narrow.

A pattern that works: on an agreed date the old system becomes read-only. Staff look things up there, and enter everything new in the new system. One term is usually enough for a school or a college. An academy with simple fees may need a few weeks.

Agree the end date before you start. A parallel run with no end date turns into two systems for good.

Go live in stages

Go live module by module, in an order that follows your year.

  1. Records and people. Everything else hangs off the student record.
  2. Fees and payments, ideally before a billing run, so families see one clean invoice.
  3. Timetable and attendance, at the start of a term or semester.
  4. Grades, report cards and transcripts, before the first marking period.
  5. Admissions for the next intake, once the rest is steady.

Train the people who use each module just before it goes live. Training given months ahead is forgotten by the first morning.

What to ask every vendor

Ask these in the demo, and ask for the answers in writing.

  • What exactly do you import, and from which files? What do you leave behind?
  • Who does the mapping, and how many hours does that take?
  • Can we check the imported data before go-live?
  • What does a parallel run look like with your system?
  • What is the timeline for an institution of our size and starting point? Can we speak to one?
  • If we leave, how do we get our data out, in what format, and how fast?
  • What does setup cost, and what is extra?
  • Which of your AI features are live today, and which are planned?

A vendor who gives a firm date for every feature on the roadmap is guessing. So is one who promises a go-live date before seeing your data.

Where Classter fits, honestly

We build Classter, so read this part with that in mind. Classter has customers in 40 countries.

What we do. We import from your spreadsheets or from your current system's exports. We map your terms, codes, grading and periods to Classter's settings, with your registrar. We bring you live one module at a time. You check the imported data before go-live. If you leave Classter, you take your data with you.

What we don't do. We don't run a certified connector to Banner, PowerSchool or iSAMS; we work from exports. We don't promise a go-live date before we have seen your data. And in a public tender, we answer your requirements line by line rather than claim fit on a web page.

Sources

  1. Regulation (EU) 2016/679 (GDPR), Article 20: the right to receive your data in a structured, machine-readable format. The basis for asking every vendor how you get your data out
  2. Regulation (EU) 2016/679 (GDPR), Article 28: what a contract with a data processor must cover, including what happens to the data when the contract ends
  3. Getting live with Classter: the four steps, the import scope by starting point and the go-live order our implementation team uses
  4. Questions buyers asked Classter about migration, timelines and exit terms in sales calls in 2025 and 2026: internal analysis, summarised in the vendor questions above

Last checked by Classter product marketing.

Getting live with Classter

See the plan for your starting point, before you sign.

Four steps, what we take from your current system, and a timeline for your size.

Want this plan for your institution?

30 minutes on Teams. We look at where you are starting from and show you the plan, the hours and the price.